合金尾气(矿热炉、硅锰/硅铁/铬铁/电石尾气)不是“低浓度瓦斯”,也不是“焦炉煤气”。可燃核心是一氧化碳,占比常到60%–80%,再带点H₂和少量CH₄,热值折算下来大概800–1000kcal/Nm³,烧起来快、毒、脏、烫。
Alloy exhaust gas (such as mineral heat furnace, silicon manganese/silicon iron/chromium iron/calcium carbide exhaust gas) is not "low concentration gas", nor is it "coke oven gas". The combustible core is carbon monoxide, accounting for 60% -80% of the total, with some H ₂ and a small amount of CH ₄. The calorific value is approximately 800-1000kcal/Nm ³, which burns quickly, is toxic, dirty, and hot.

直接把天然气机接过去,先爆缸后积碳。
Connect the natural gas engine directly, first blow up the cylinder and then accumulate carbon.
先过三道前置关
First, go through three preliminary levels
第一关:降温收尘
Level 1: Cooling and Dust Collection
出炉气800–1200℃,先走双层水冷夹套+旋风,把SiO₂微珠、粉尘、焦油前驱物打掉。不降温就进袋滤,滤袋三天板结;不除尘,活塞环跑不满三个月。
Take out the furnace gas at 800-1200 ℃, first use a double-layer water-cooled jacket+cyclone to remove SiO ₂ microbeads, dust, and tar precursors. If it doesn't cool down, it will be filtered in a bag, and the filter bag will solidify in three days; Without dust removal, the piston ring has been running for less than three months.
第二关:净气指标卡死
Level 2: The net gas index is stuck
进机前净气建议红线:
Suggested red line for air purification before entering the machine:
温度≤40℃,压力波动≤1kPa/min(稳压罐+变频增压);
Temperature ≤ 40 ℃, pressure fluctuation ≤ 1kPa/min (stabilizing tank+variable frequency boosting);
焦油≤50mg/Nm³,H₂S≤50mg/Nm³,总硫≤200mg/Nm³;
Tar ≤ 50mg/Nm ³, H ₂ S ≤ 50mg/Nm ³, total sulfur ≤ 200mg/Nm ³;
粉尘粒度≤5μm、总杂≤30mg/Nm³;
Dust particle size ≤ 5 μ m, total impurities ≤ 30mg/Nm ³;
水分≤40g/Nm³,无游离水;
Moisture content ≤ 40g/Nm ³, no free water;
H₂体积分额宜控60%以内,CO高但别让含氧跑起来。
The volume fraction of H ₂ should be controlled within 60%, and high CO should not allow oxygen to run.
第三关:防爆与在线
Level 3: Explosion proof and Online
CO爆炸边界宽,机房按可燃+有毒气体双报警设计。进气管不设预混腔,燃气阀件Ex认证,CO/LEL/氧含量在线,超限平稳切机不短接保护。
The CO explosion boundary is wide, and the computer room is designed with dual alarms for combustible and toxic gases. The intake pipe does not have a pre mixing chamber, the gas valve components are Ex certified, the CO/TEL/oxygen content is online, and there is no short circuit protection for smooth machine shutdown when exceeding the limit.
燃烧系统三处建议改
Three parts of the combustion system must be modified
缸内混合直喷
In cylinder mixed direct injection
空气和燃气分气道增压,燃气在压缩行程末期喷入气缸。进气管里不存预混气,从物理上灭掉回火放炮。
Air and gas are pressurized through separate passages, and gas is injected into the cylinder at the end of the compression stroke. There is no premixed gas in the intake pipe, so it is necessary to physically extinguish the backfire and fire.
稀薄燃烧+空燃比闭环
Lean combustion+air-fuel ratio closed-loop
激光氧传感器实时控空燃比,目标区间1.8–2.2。炉况一变(原料潮、电偏、风量跳),热值分钟级波动,电控自动修正各缸燃气喷射量,单缸排温偏差超阈值降载不停机。
The laser oxygen sensor controls the air-fuel ratio in real-time, with a target range of 1.8-2.2. When the furnace condition changes (such as raw material moisture, electrode deviation, and air flow jump), the calorific value fluctuates in minutes. The electronic control automatically corrects the gas injection amount of each cylinder, and the single cylinder exhaust temperature deviation exceeds the threshold and the load is reduced without stopping the machine.
定压排气+爆震反馈
Constant pressure exhaust+detonation feedback
别用脉冲排气,各缸互相干扰。定压排气系统+缸内爆震传感器,提前角动态退角,防CO/H₂混合气在缸内硬震。
Do not use pulse exhaust, as each cylinder interferes with each other. Constant pressure exhaust system+cylinder detonation sensor, dynamic advance angle retreat, preventing CO/H ₂ mixture from hard shock in the cylinder.
功率配置看气源稳定性
Power configuration depends on gas source stability
矿热炉连续满负荷:多台500–1000kW并机,留1台备用,单台检修不掉电;
Continuous full load of ore blast furnace: multiple 500-1000kW parallel units, with one backup unit left, and no power loss during single maintenance;
炉况波动大:缓冲气柜+稳压,再进机组,别让机组替矿炉背波动;
Large fluctuations in furnace conditions: buffer gas holder+stabilize voltage before entering the unit, do not let the unit cause fluctuations in the back of the ore furnace;
余热梯级:缸套水供热+烟气进余热锅炉,综合能效拉到45%以上,比单发电划算。
Waste heat cascade: cylinder liner water heating+flue gas entering the waste heat boiler, with a comprehensive energy efficiency of over 45%, which is more cost-effective than single power generation.
运行期盯四件事
Focus on four things during the operation period
单缸排温曲线(偏差超30℃查喷嘴/气阀);
Single cylinder exhaust temperature curve (check nozzle/valve if deviation exceeds 30 ℃);
燃气滤芯压差(合金灰黏,建议300–500h换);
Gas filter differential pressure (alloy ash sticking, recommended to replace after 300-500 hours);
火花塞积碳(2000–3000h检,杂质多提前);
Spark plug carbon deposition (tested between 2000-3000 hours, with impurities detected earlier);
在线色谱:CO/H₂/氧实时,不靠半月送检。
Online chromatography: CO/H ₂/oxygen real-time, not sent for testing within half a month.
验收带三样去现场
Take three samples to the site for acceptance inspection
送1个月炉口气样曲线(温度/压力/CO/H₂/硫/焦油);
Send a one month furnace gas sample curve (temperature/pressure/CO/H ₂/sulfur/tar);
满负荷4h+人为模拟炉况跳变,看空燃比自修正、回火保护真动作;
Full load for 4 hours+artificial simulation of furnace condition jump, observing the true action of air-fuel ratio self correction and tempering protection;
连续72h看滤芯损耗、排温均匀性、机油金属颗粒趋势。
Observe the filter loss, temperature uniformity, and trend of oil metal particles continuously for 72 hours.
合金尾气发电机组不是“改装天然气机”,是把矿热炉口那股高温毒气,用“降温除尘—稳压净气—缸内隔离混合—稀薄燃烧—防爆联锁”焊成稳定电表。预处理省一道,后面火花塞和活塞先替你上班。
The alloy tail gas generator set is not a "modified natural gas engine", but a stable electric meter welded from the high-temperature toxic gas at the mine heat furnace mouth using "cooling and dust removal - stabilizing clean gas - cylinder isolation and mixing - lean combustion - explosion-proof interlocking". Pre processing saves one, and the spark plug and piston will work for you first.